Headwall Installation Aylesbury

David Day, Land Structure site manager
“We installed the polymer headwall adjacent to a live watercourse. The installation was completed in 2hrs together with a flapvalve which the headwall was designed to receive. I found the after sales advice and service from Permashutter to be first class.”

Headwall Installation Case Study:

Product: Polymer Headwall HW450C with a Hambaker 300mm ductile iron flapvalve.


Project: Aylesbury Theatre
Location: Aylesbury
Client: Willmot Dixon
Contractor: Land Structure Ltd
Engineer: Hankinson and Duckett
Date: October 2010
Project Description:
Construction of new theatre and landscaped wetland area at rear. The polymer headwall was specified by Hankinson and Duckett because they required an aesthetically pleasing headwall which was quick to install in live watercourse.

Nick Thomas - Landscape Architect Hankinson and Duckett