headwall_outfall.jpg
A Revolution in Headwall Installation

UKAS certification

The construction of very high quality heavy duty concrete headwalls can be completed in hours with the use of a Permashutter polymer headwall.

Multiple stage concrete pours involving numerous visits by carpenters and steel fixers are now a thing of the past.Heavy lifting equipment,timber formwork and steel reinforcing are no longer required.

The headwall can be positioned, aligned and filled in ONE visit complete with a full range of  attachments such as handrails, pipe guards, trash screens, penstocks and flapvalves.Key features

 
JoomlaWatch Stats 1.2.9 by Matej Koval