Key Details


  • Handrail: Hot dipped galvanised to BS 729 after fabrication.
  • Handrail Recesses: Once the mould is full the handrail can be added by inserting into the preformed recesses. (see fig. a)
  • Environmental Impact: The concrete is placed into the mould through the slots shown in fig. a. Caps are fitted once the mould is filled.
  • Trashscreen: hot dip galvanised to BS 729 after fabrication. It is fixed to the headwall with stainless steel bolts, and is both hinged and lockable for easy cleaning / maintenance.(see fig c)
  • Trashscreen fixing points: bolts are inserted into pre-formed holes in the front face of the mould to anchor the pipe guard.
  •  Flap Valve Fixing Point: stainless steel bolts are inserted into the preformed locators to affix the flap valve(see fig. b)